Pályázatok
Előszűrt magyar és EU-s kiírások.
Töltsd ki a cégprofilt a jogosultsághoz
720 pályázat
Kereső mentéseEnhancing physical protection of critical infrastructures
Expected Outcome: Project results are expected to contribute to some or all of the following outcomes: Critical infrastructure operators and authorities have improved physical risks and hazards assessment capabilities; Perimeter security, access control, surveillance systems, remote sensors and other systems used by or relevant to critical infrastructure operators are capable of coping with threat
2027. november 4. · 457 nap van hátra
Országos
EIC Pre-accelerator - Widening
Expected Outcome: This call will increase the innovation potential of deep-tech startups in the Widening countries and enable them to better attract private investments and scale up. It will further strengthen the innovation dimension of the widening component and increase the overall competitiveness of these countries. The specific outcome expected of this action is increased business, investor,
2027. november 18. · 471 nap van hátra
Országos
MSCA Doctoral Networks 2027
Expected Outcome: Project results are expected to contribute to the following outcomes: For supported doctoral candidates New research and transferable skills and competences, leading to improved employability and career prospects within and outside academia; New knowledge allowing the conversion of ideas into products and services, where relevant; Enhanced networking and communication capacities
2027. november 23. · 476 nap van hátra
Országos
Intergenerational neighbourhoods and communities aligned with the New European Bauhaus
Expected Outcome: Project results are expected to contribute to all of the following expected outcomes: Demonstrated methodology is used by architects, spatial planners, designers and other relevant actors to identify the extent to which neighbourhoods [1] and communities [1] are intergenerational [1] . Demonstrated solutions for intergenerational neighbourhoods and communities are available to pu
2027. december 1. · 484 nap van hátra
Országos
Industrial processes and equipment for innovative, reliable and scalable tandem technologies (EUPI-PV Partnership)
Expected Outcome: The REPowerEU plan and the EU Solar Energy Strategy introduced targets for the deployment of solar PV amounting to 600 GWac by 2030. Complying with these targets will be crucial for the European Union to reach its climate targets and free itself from import dependency on fossil fuels and the costs this imposes on Europe’s competitiveness in terms of high energy prices. The Solar
2027. december 1. · 484 nap van hátra
Országos
Demonstration of hydropower technologies for efficient and forward-looking refurbishment of existing hydropower plants
Expected Outcome: For a renewables-based electricity system sufficient flexible and also in the long-run fully sustainable hydropower capacity is pivotal. Project results are expected to contribute to all of the following expected outcomes: Enhancing the capacities of the hydropower fleet to contribute with variable renewables base load to a secure and stable electricity system, including by moder
2027. december 1. · 484 nap van hátra
Országos
Integrated Approaches for Retrofitting Infrastructures with Innovative Energy Storage Technologies
Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Improved energy security of the energy system by offering cost-effective and efficient solutions for additional diverse and flexible energy storage capacities. Improve the sustainability and circularity of energy storage systems. Enhanced economic viability of energy storage by utilizing existing i
2027. december 1. · 484 nap van hátra
Országos
Advanced TSO control rooms to enhance grid observability, stability and resilience
Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, and efficiency of electricity transmission grids. Grid congestion is managed efficiently; Enhanced observability of grids and improved forecasting of supply, demand, grid capacity availability, and flexibility; Transmission system operators (TSO) leverage modern di
2027. december 1. · 484 nap van hátra
Országos
Community of practice - Data-Driven Decision-Making in Energy
Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced EU cooperation to generate knowledge sharing on data and analytics used for the planning and operation of European grids, and market integration; Better EU coordination with regard to planning and simulation tools to support the development of electricity grids and integration of RES are m
2027. december 1. · 484 nap van hátra
Országos
Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids
Expected Outcome: Project results are expected to contribute to all the following expected outcomes: Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; Distribution system operators (DSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improv
2027. december 1. · 484 nap van hátra
Országos
Delivery of industrial CCUS clusters – Societal Readiness pilot
Expected Outcome: Project results are expected to contribute to all of the following outcomes: Near-to-market solutions for the safe integration and use of CCUS technologies in the energy- and carbon-intensive industry; A pipeline of projects that have the potential for commercial scale-up. Deeper understanding of the needs and concerns of diverse social groups involved in or potentially affected
2027. december 1. · 484 nap van hátra
Országos
Combining conventional and innovative construction materials, products and techniques for sustainable and beautiful buildings
Expected Outcome: Project results are expected to contribute to all of the following expected outcomes: More optimised construction or renovation processes and improved building performance thanks to hybrid building solutions combining innovative and conventional construction materials, products or techniques. Increased awareness of the construction ecosystem [1] actors of the positive and negativ
2027. december 1. · 484 nap van hátra
Országos
The transformative potential of co-governance in the green transition of neighbourhoods
Expected Outcome: Project results are expected to contribute to all of the following expected outcomes: Policy makers, local administrations and neighbourhood [1] actors across Europe and beyond have access to evidence-based guidance and recommendations to support public participation in the green transition [1] of neighbourhoods, including their nature-positive [3] transformation. Co-governance [
2027. december 1. · 484 nap van hátra
Országos
Mass customisation of offsite manufactured modular construction components to transform the existing built environment
Expected Outcome: Project results are expected to contribute to all of the following expected outcomes: Stakeholders involved in the construction [1] and renovation ecosystem adopt innovative solutions for the mass customisation of offsite manufactured modular construction components. Significantly reduced waste and environmental impacts (including air quality, noise and transportation) and enhanc
2027. december 1. · 484 nap van hátra
Országos
PV based electrification of the economy: Designing & optimising PV systems supporting industrial electrification and promoting participation in electricity markets (EUPI-PV Partnership)
Expected Outcome: Large PV systems such as utility scale PV are evolving towards higher voltage architecture (>=3kV) with the objective to minimize losses and improve system efficiency at lower costs. The intention is to integrate also storage into such (hybrid) PV systems offering flexibility. It is consequently essential to build a blueprint for the implementation of high voltage large PV sys
2027. december 1. · 484 nap van hátra
Országos
Sustainable, beautiful and healthy construction and renovation sites
Expected Outcome: Project results are expected to contribute to all of the following expected outcomes: Construction ecosystem actors [1] are better aware of the negative effects of construction and renovation sites on natural ecosystems as well as on the health and well-being of construction workers and all people living, working or passing through the vicinity. Significant reduction of negative
2027. december 1. · 484 nap van hátra
Országos
Anticipating the long-term future of neighbourhoods in line with the New European Bauhaus
Expected Outcome: Project results are expected to contribute to all of the following expected outcomes: Local stakeholders adopt long-term stewardship and participate [1] in anticipating and envisioning the long-term future [2] of their existing neighbourhoods [3] . Existing neighbourhoods are more resilient and can adapt to changing socioeconomic, cultural, demographic, and climatic conditions, c
2027. december 1. · 484 nap van hátra
Országos
Innovative models for collective community investment and ownership
Expected Outcome: Project results are expected to contribute to all of the following expected outcomes: Community [1] stakeholders co-create [1] and participate [3] in innovative community investment and community ownership models. Community stakeholders benefit from increased local democratic participation, social equity and cohesion, a sense of place and belonging, and local economic development
2027. december 1. · 484 nap van hátra
Országos
Revitalising neighbourhoods around existing railway and motorway corridors
Expected Outcome: Project results are expected to contribute to all of the following expected outcomes: The use of the innovative solutions reduces the environmental, ecological, economic, social and health negative effects of existing, active railway lines and motorways [1] on demonstrator sites, contributing to their revitalisation. Improved adoption of solutions by the stakeholders such as loca
2027. december 1. · 484 nap van hátra
Országos
Novel combinations of knowledge and research methods to address social issues and advance a fair green transition of neighbourhoods
Expected Outcome: Project results are expected to contribute to all of the following expected outcomes: The scientific community, public authorities and neighbourhood [1] actors have a better understanding of social issues that influence the green transition [1] in neighbourhoods thanks to novel, transdisciplinary [1] combinations of knowledge and research methods. Robust evidence resulting from n
2027. december 1. · 484 nap van hátra
Országos
Hitelkeret GINOP PLUSZ 1.prioritás keretében fejlettebb régióban -technikai felhívás
Pénzügyi eszköz– hitel — Pénzügyi eszköz
2027. december 30. · 513 nap van hátra
Nyugat-Dunántúl, Észak-Magyarország, Közép-Dunántúl, Észak-Alföld, Dél-Dunántúl, Budapest, Pest, Dél-Alföld
Max. támogatás: 65 344 120 222 Ft
Levegőminőségi intézkedések (ERFA)
a KEHOP PLUSZ 3. prioritás, Környezet- és természetvédelem, a Levegőminőség javítás érdekében mérőhálózat korszerűsítés támogatási célterület szakmai tartalmának megvalósítása. A prioritás támogatja a környezeti elemek védelmét szolgáló intézkedések és korszerű technológiák bevezetését, a hatósági levegőminőségi ellenőrzések megalapozását elősegítő mérőhálózat fejlesztését.
2027. december 30. · 513 nap van hátra
Nyugat-Dunántúl, Észak-Magyarország, Közép-Dunántúl, Észak-Alföld, Dél-Dunántúl, Budapest, Pest, Dél-Alföld
Max. támogatás: 371 836 632 Ft
Szennyezett területek humán-egészségügyi kockázatainak csökkentése (ERFA)
A Felhívás elsődleges célja a felszín alatti vizek és a földtani közeg szennyezettségének, környezeti kockázatainak csökkentése az állami felelősségi körbe sorolt kármentesítési beavatkozások tervezésével és végrehajtásával. Kiemelt cél továbbá a kármentesített terület gazdasági, illetve jóléti célú hasznosításra való előkészítése.
2027. december 30. · 513 nap van hátra
Nyugat-Dunántúl, Észak-Magyarország, Közép-Dunántúl, Észak-Alföld, Dél-Dunántúl, Budapest, Pest, Dél-Alföld
Max. támogatás: 6 290 000 000 Ft
Vízkárelhárítás, vízháztartási szemléletű vízrendezés
A vizek többletéből és hiányából eredő kártételekkel szembeni ellenálló-képesség javításának megvalósítása.
2027. december 30. · 513 nap van hátra
Nyugat-Dunántúl, Észak-Magyarország, Közép-Dunántúl, Észak-Alföld, Dél-Dunántúl, Budapest, Pest, Dél-Alföld
Max. támogatás: 40 460 000 000 Ft

